Home
PDF download
Cite article
Share options
Informations, rights and permissions
Issue image
2026
Pages: -
Professional paper
Assessment, rehabilitation and reconstruction
See full issue

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. 

Metrics and citations
Abstract views: 1
PDF Downloads: 1
Google scholar: See link
Article content
  1. Abstract
  2. Disclaimer
Professional paper Assessment, rehabilitation and reconstruction

FULL REPLACEMENT OF STAY CABLE SYSTEM: STATE OF THE ART PRACTICES, DEDICATED METHODS, MODERN SYSTEM INTEGRATION, AND RISK MITIGATION

By
Matthieu Guesdon ,
Matthieu Guesdon
Contact Matthieu Guesdon

Freyssinet , Paris , France

Nicolas Fabry ,
Nicolas Fabry

Freyssinet International , Paris , France

Patrick Ladret ,
Patrick Ladret

Freyssinet Spain , Madrid , Spain

Miodrag Stanković
Miodrag Stanković

Freyssinet Serbia Serbia

Abstract

As many cable stayed bridges built in the 1960s reach the end of their original service life, replacing aging stay cable systems has become a major challenge for infrastructure owners. Corrosion, obsolete protection systems, and modern durability requirements drive the need to upgrade these structures with high performance cables. Freyssinet has developed strong expertise in this field, combining advanced engineering, dedicated equipment, and rigorous risk management. This paper presents Freyssinet’s approach through recent projects such as the Hooghly River Bridge, the Galecopper Bridge, and the Marqués de Zafra footbridge. These cases highlight two main challenges: integrating modern cable systems into structures designed for older technologies, and safely managing detensioning operations despite uncertainties about existing cable conditions. Freyssinet addressed these issues by engineering tailored solutions, including redundancy systems, controlled detensioning methods, and the installation of durable, replaceable parallel strand systems. This methodology ensures safe cable replacement while preserving structural integrity and minimizing user impact.

Funding Statement

This paper is fully self-funded by Freyssinet.

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Most read
See all >
Latest
See all >
Citations
Crossref Logo

0