This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
QA/QC, Quality Control Engineer, CPM Consulting , Belgrade , Serbia
This paper presents the full-scale static tensile factory acceptance testing of the OVM.ST15-47 parallel-strand hanger system intended for installation on the New Sava Bridge in Belgrade, Serbia. Each tested hanger assembly consisted of 47 seven-wire prestressing strands, with a nominal tensile strength of 1,860 MPa and a nominal cross-sectional area of 150 mm² per strand, together with the associated anchorage and fork components. Two representative full-scale hanger specimens were subjected to a predefined staged loading procedure, including a 60-minute load-holding period at 0.8 of the guaranteed ultimate tensile strength (GUTS), followed by loading to the governing acceptance force. The required acceptance force was defined as the greater of 95% GUTS and 92% of the calculated actual ultimate tensile strength (AUTS) of the 47-strand bundle. Both specimens exceeded the governing force and minimum elongation requirements. No damage to specimens and no failure of anchorage-system components were observed after the loading procedure. The results demonstrate that both tested hanger assemblies satisfied the specified static tensile acceptance criteria.
arch bridge, bridge hanger, parallel-strand system, full-scale testing, factory acceptance testing, static tensile test, anchorage system
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.